With over 40 years of design & construction experience, we are absolutely the one-stop shop for your next marine project design and construction requirements!

Manually installing 4 pilings onto a pier Waterside first built in 1998 when it was “Heck of a Deck” …LOL Pier is still in fine shape. Lumber was better quality back then. And the deck is still original and fully intact and solid. the manual piling hammer is 100#, not easy to carry around, or to use, but my guys are kind of beastly. The 1.5″ steel plate at the top is the key to it working so well. And the large handles and 4′ long barrel.