The Pond is finally completed, and the overflow pipe is installed, encasing the 90 degree elbow completely within concrete, and 2 large tubes of silicone, one for each O-ring gasket joint. We cannot take a chance 10 years from now having this thing leak because it will from now on be under 5 feet of water, buried within the dam. Simple technology, but pre-cautionary just the same.