Shoretech Marine
Video Gallery

With over 40 years of design & construction experience, we are absolutely the one-stop shop for your next marine project design and construction requirements!

A different view of the Dove Island Drive bulkhead for the Blesener and Jackson families on the 4th day of work show how we have upgraded our specifications for timber shoreline bulkheads due to fast-growth timber.

These 12’ piles are on 4 feet centers and will have 10 feet long sheet piling driven behind the 3×8 full-dimension timber stringers on a new bulkhead with about 4.75’ of exposure from the mudline to the top.

This will leave a strong long-lasting shoreline reinforcement that will last for decades.