After re-excavation with the large trackhoe, the dry sand is pushed back in on the proper angle with the dozer, making forming an easy task. We are scheduled to pour Thursday morning early. Pump Pads, Boat Ramp, and the Dam Overflow Keyway. About a 13 cubic yard triple-pour morning. Should take no more than 4 hours total.