Call Dave: 936-662-5100
Lakes We Serve · Franklin County, TX

Boathouses and retaining walls on Lake Cypress Springs.

The most tightly written rulebook of any lake in East Texas — and the one where the water district owns the ground your house sits on. Here is what the Franklin County Water District actually requires, in the District's own numbers.

Start Here

This is not fee-simple waterfront.

The Franklin County Water District owns Lake Cypress Springs and the surrounding District Property, and leases lakefront lots to residents — who are “Lessees” under a written lease.

That structure changes the whole transaction. The person applying for a shoreline permit here is a tenant of the District, not an owner whose deed runs to the water. FCWD permits every structure on the lake from its office at 112 N. Houston St. in Mount Vernon, on the east side of the square — 903-537-4536, open 8:30 a.m. to 4:30 p.m. Monday through Friday and closed 11:30 to 12:30 for lunch.

The District issues a separate permit for each project: an On Water Facilities Permit for boathouses, piers, EZ Ports and jet ski lifts; a Retaining Wall Dredge Permit for retaining walls, bulkheads and dredging; plus a Paint and Stain Permit, a Building Permit, a Demolition Permit, a Water Pump Permit and a Commercial Work Permit. One permit per permitted project — a boathouse and the wall beneath it are two applications.

And there is a rule that decides who can even bid your job. Under Rules 15.9 and 15.30, only contractors listed on the District's Contractor Registry and in good standing may perform permitted work on District Property. Registration carries an application fee plus an annual update and renewal fee, and requires proof of ownership or authorization for all equipment, including work vessels. Any unresolved permit violation puts a contractor out of good standing and blocks new permits — which means on this lake a contractor's paperwork history is part of what you are buying.

Rule 15.3 adds a federal layer on top: all dredging, filling and retaining wall activities must be performed in accordance with all applicable U.S. Army Corps of Engineers regulations and permits, and soil-disturbing work has to use erosion controls such as silt fencing and rock gabions.

378.00′
Normal pool elevation, msl
43
Miles of shoreline (TWDB)
~850
Waterfront homes
1970
Impoundment began July 7
The Rules, In Numbers

What the District specifies for a wall and a dredge.

Most lakes leave the details to the contractor. Lake Cypress Springs writes them down — which is a gift, if you read them before you design.

1

Wall height and intent

A retaining wall must be built to a height of 2 feet above normal pool elevation 378.00 ft msl, and “designed and constructed in a manner that improves the shoreline alignment, functionality, and enhances the aesthetics of the Lake.” Alignment is a stated requirement here, not a matter of taste.

2

Where the backfill comes from

Backfill used below elevation 385.0 ft msl must be reclaimed from the reservoir unless specialized backfill is specified by a registered Texas professional engineer. You do not simply truck in material behind a new wall on this lake.

3

Setbacks and the as-built

Setbacks are 10 feet from the lakeside property line or the normal lake elevation shoreline, whichever is further inland. Final approval of any project requires an As-Built Survey showing no encroachment over property or setback lines — so the survey is part of the job, not an afterthought.

4

Dredging limits

No dredging within six feet of a retaining wall or bulkhead. No dredged soil deposited in the lake or transported across it by barge. A mildly sloping bottom must be maintained to prevent drop-offs. Inspections are required before dredging begins and again at completion.

Over the Water

What an on-water facility is allowed to be.

The On Water Facilities Permit comes with a dimensional envelope that shapes every boathouse on the lake.

An on-water facility is capped at 40 feet of total combined length including porches and decks, 2,000 square feet of covered area and 3,000 square feet in total, one story, and 25 feet above 378 msl. Only one fixed facility is permitted per lot, and only on a lot that already carries a single-family residence — an empty lot does not get a boathouse first.

Below that, the details are just as specific. The deck floor must be at least 24 inches above 378.00 ft msl. Boat lifts must maintain a 16-foot internal range and jet ski lifts 12 feet. A 40-foot clear channel has to be preserved. Note the second elevation running through the Rules: 385.0 to 385.50 feet msl is the reference for backfill sourcing, for floating lift flotation and for finished floor. Two governing datums, not one — and mixing them up is how a design gets rejected.

Scope of Work

What Shoretech can build on Lake Cypress Springs.

The District's own rules assume a walled shoreline. Retaining walls are treated as the normal condition here, with a defined top elevation and a stated duty to improve the shoreline alignment.

Retaining Walls & Bulkheads

Walls built to 2 feet above the 378.00-foot pool under a Retaining Wall Dredge Permit, with backfill sourced as the Rules require and erosion control in place from day one.

Boathouses & On-Water Facilities

Covered slips and entertainment decks drawn inside the 40-foot length, 2,000-square-foot covered and 3,000-square-foot total caps, with deck floor and lift ranges set to the District's elevations.

Precision Dredging

Slip dredging that respects the six-foot standoff from a wall, keeps a mildly sloping bottom, and moves material without depositing it in the lake or barging it across.

Boat Docks & Piers

Piers, EZ Ports and jet ski lifts under the same On Water Facilities Permit, laid out to preserve the required 40-foot clear channel.

Water, Bottom & Calendar

Clear water, a sand-and-clay bottom, and a schedule with holes in it.

Normal pool is 378.00 feet above mean sea level; the earthfill dam crests at 395 feet, and Texas Parks & Wildlife lists routine fluctuation of 2 to 3 feet.

The bottom is sand and clay. Water is clear under normal conditions, and Lake Cypress Springs is one of the few East Texas lakes without established hydrilla, thanks to grass carp stocking — aquatic vegetation covers under 10 percent of the surface. Structure is riprap near the dam, terrestrial brush and trees along the shorelines, and a great many boat houses.

FCWD releases downstream to meet its water supply obligation, primarily to the City of Mount Pleasant at 3,590 acre-feet a year, and its Drought Contingency Plan suspends lakeside water pumping permits at the severe stage — worth knowing if a project includes an irrigation intake.

Two scheduling constraints matter before anyone quotes a job. No permitted commercial activity is allowed during Memorial Day, Independence Day or Labor Day weekends. And no more than two commercial work barges may be on the lake at any one time — on a lake with roughly 850 waterfront homes, that is a genuine queue in the busy season. Between the barge cap, the holiday blackouts, the pre- and post-dredge inspections and the As-Built Survey at the end, a Lake Cypress Springs project is planned around the District's calendar, not just the weather.

Around the Lake

Twenty subdivisions, five District parks, and no public marina.

About 850 waterfront homes across roughly 20 subdivisions, on a lake widely marketed as the most beautiful in Texas.

Towns and nearby communities

  • Mount Vernon
  • Scroggins
  • Winnsboro nearby
  • Mount Pleasant nearby

District parks and access

  • Walleye Park — north shore near the dam, 72 campsites on a peninsula, the lake's only fish cleaning station
  • Guthrie Park — north end of the dam
  • Dogwood Park — south end of the dam
  • Overlook Park — north shore at mid-lake
  • Mary King Park — south shore at mid-lake
  • Lake Bob Sandlin State Park, just downstream

All the parks are District-operated with a $2 per person day-use fee or an annual pass, and there is no public marina. Lake Cypress Springs impounds Big Cypress Creek in the Cypress River basin in Franklin County, discharging downstream into Lake Bob Sandlin; impoundment began July 7, 1970 and the dam was completed February 15, 1971. Maximum depth is about 56 feet with an average of roughly 19.3 feet. Published figures differ on size — the Texas Water Development Board's 2007 survey gives 3,252 acres at conservation pool while Texas Parks & Wildlife and general use give 3,461, and shoreline is given as 43 miles by TWDB and 47 elsewhere. The District amends its Rules and Regulations periodically, so the current version is confirmed with FCWD before any specific number is relied on for a quote.

Questions We Hear

Lake Cypress Springs FAQ.

Who owns the shoreline on Lake Cypress Springs?

The Franklin County Water District. FCWD owns the lake and the surrounding District Property and leases lakefront lots to residents, who are Lessees under a written lease. That makes this different from most Texas lakes — the person applying for a shoreline permit is a tenant of the District, not an owner to the water's edge. The District office is at 112 N. Houston St. in Mount Vernon, on the east side of the square, 903-537-4536.

Can any contractor work on Lake Cypress Springs?

No. Under Rules 15.9 and 15.30, only contractors listed on the District's Contractor Registry and in good standing may perform permitted work on District Property. Registration carries an application fee plus an annual update and renewal fee and requires proof of ownership or authorization for all equipment, including work vessels. Any unresolved permit violation puts a contractor out of good standing and blocks new permits.

How tall does a retaining wall have to be here?

The District Rules require a retaining wall to be built to a height of 2 feet above the normal pool elevation of 378.00 feet msl, and to be designed and constructed in a manner that improves the shoreline alignment and functionality and enhances the aesthetics of the Lake. Backfill placed below elevation 385.0 feet msl must be reclaimed from the reservoir unless specialized backfill is specified by a registered Texas professional engineer.

How big can a boathouse be?

On-water facilities are capped at 40 feet total combined length including porches and decks, 2,000 square feet of covered area and 3,000 square feet total, one story, and 25 feet above 378 msl. Only one fixed facility is allowed per lot, and only on a lot that already has a single-family residence. The deck floor must sit at least 24 inches above 378.00 feet msl, boat lifts must maintain a 16-foot internal range and jet ski lifts 12 feet, and a 40-foot clear channel has to be preserved.

Are there times of year work cannot happen on the lake?

Yes. No permitted commercial activity is allowed during Memorial Day, Independence Day or Labor Day weekends, and no more than two commercial work barges may be on the lake at any one time. Both constraints belong in the schedule before a job is quoted, not after.

Start With a Conversation

Planning a project on Lake Cypress Springs?

Tell Dave what your existing wall and facility look like, what the lease covers, and what you want the finished waterfront to do. On this lake the permit envelope shapes the design from the first sketch.