More than 320 miles of shoreline, thirteen lake towns and one landlord — the Tarrant Regional Water District. Every structure at or below elevation 325.00 needs an Improvement Permit, and that includes changing the one you already have.
TRWD owns and operates Cedar Creek and issues the permits directly — no city, no county, no Corps district in the chain.
The Tarrant Regional Water District runs Cedar Creek from its lake office at 6613 Ashby Lane, Trinidad, TX 75163, (903) 432-2814. An Improvement Permit is required for all construction, placement or operation of any structure or facility of any type, and for excavating or placing fill materials, at or below elevation 325.00 feet msl — and that expressly includes any addition or modification to an existing structure. Applications now go through TRWD's online portal, and construction may not start until the application is approved. Submitting is not approval.
The submittal is specific. It requires the signatures of both owner and contractor, a recorded plat showing shore front dimensions and the location of the improvement, proof of ownership, scaled plans and construction details at one inch to thirty feet or larger with views from all five sides, and a $100.00 non-refundable fee — no cash. The outside corners of the lot at roadside and at elevation 325.00 must be clearly marked at the pre-permit inspection and stay marked throughout construction.
Contractors must carry general liability of no less than $500,000 per occurrence naming TRWD as additional insured with a waiver of subrogation. The guidelines state flatly that there are no exceptions, and a current certificate is required each time a permit is submitted. Allow ten working days for processing. Permits run a minimum of 30 and a maximum of 90 days; one extension may be granted for an additional $50.00. Building without a permit violates the General Ordinance and is a Class C misdemeanor carrying $10 to $1,000 per violation, per day.
Two honest notes on the fine print. The $100 permit fee and the $50 extension come from the District's published guidelines; TRWD maintains its fee schedule separately, so confirm the live numbers with the Trinidad office. And there is a genuine discrepancy on roof pitch — an older standalone Cedar Creek guideline sheet revised in 2001 caps it at 4 in 12, while the current consolidated Residential Improvement Permit Guidelines give 6 in 12. We design to 6 in 12 as the current figure and confirm it with the office before framing.
Cedar Creek sizes structures on a sliding scale tied to how much shoreline you own, and then constrains almost everything about what sits on top of it. The design brief writes itself once you know the numbers.
Eight square feet of structure per linear foot of shoreline up to 150 feet — a hard 1,200 square feet — then an additional 4 square feet per foot from 151 to 250 feet, 2 square feet per foot from 251 to 450, and 1 square foot per foot beyond 450. Nothing may come closer than 5 feet to a property line, and anything over 1,200 square feet must be 20 feet off. In a channel: no more than a third of the width, and never within 10 feet of the centerline.
Enclosed structures are not allowed. Solid sides are permitted only two feet down from the roofline. No living quarters below the spillway elevation, no toilets, no three-story sun decks. The deck must sit at least 18 inches above elevation 322.00. Roof pitch is capped at 6 in 12 under the current guidelines. Boathouse design here lives inside that envelope — which, done well, is also the version that stays cool in an East Texas August.
Concrete, soil cement, minimum 8-gauge steel sheet piling, PVC sheet piling, pressure treated lumber and rip rap. Creosote will not be approved — not for walls and not for pilings. Walls must be built so as to improve the shoreline alignment, and backfill for any approved reclamation must be taken from the reservoir. Steel pilings must be at least 2-7/8 inches in diameter; wood pilings pressure treated and at least 6 inches.
Dredging must leave a gently sloping lake bottom with no holes or sudden drop-offs, dredged material must be placed so no sediment runs back into the reservoir, and containment or silt screens may be required — TRWD recommends calling 1-800-DIGTESS first. Anything extending more than 50 feet from shore needs a dusk-to-dawn white light. And since 2006, the owner's address must appear on a weather-resistant aluminum sign 1/16 inch or thicker with four-inch reflective letters, mechanically fastened and visible from the lakeside.
Cedar Creek Lake lies in Henderson and Kaufman counties on Cedar Creek, a tributary of the Trinity River, with the dam about three miles northeast of Trinidad. Construction started in April 1961, the project was completed in 1965, and deliberate impoundment began 2 July 1965. Athens is about 15 miles east and downtown Dallas about 50 miles northwest.
There is no rock to build against on this lake. What holds a wall up is what you put behind it.
Cedar Creek is a blackland-prairie reservoir with a soft bottom — clay and silt rather than rock. Water runs moderately clear at the lower end and muddy in the upper end, with light native emergent, submergent and floating vegetation in the coves and creek arms down toward the dam. The shoreline is long, heavily subdivided and full of shallow coves, which is exactly the geometry that produces a large stock of aging bulkheads and a steady replacement cycle.
On water level: the conservation or spillway elevation is 322.00 feet msl and the current 100-year flood level is 325.00. Because of the flooding potential, TRWD purchased a flood easement covering the property between those two elevations — which is why the permit threshold sits at 325.00 rather than at the waterline. As a water supply and conservation project the level varies with withdrawals, evaporation, rainfall and runoff; TPWD reports typical fluctuation of about 4 feet.
On surface area, published figures disagree and we will not pick one: TPWD gives 32,623 acres, while the Texas Water Development Board's 2005 survey gives 32,873 acres at operating elevation 322 feet msl. Shoreline runs over 320 miles and maximum depth is about 53 feet.
Shoretech is based in Trinity and serves waterfronts across Texas and western Louisiana. Every scope below is drawn to TRWD's Improvement Permit guidelines from the first sketch.
Steel or PVC sheet piling, concrete, soil cement, pressure treated timber or rip rap — set to improve the shoreline alignment, with tie-back design doing the work the soft clay will not.
Sized to the frontage formula, set back 5 feet from the line (20 if over 1,200 square feet), decked 18 inches above 322.00, and lit if the reach exceeds 50 feet.
Open-sided by rule and better for it — cross-ventilated cover, lifts, lighting and storm-rated substructure inside the District's dimensional envelope.
Slip and access dredging finished to a gently sloping bottom with no holes or drop-offs, with containment or silt screens where required, and material pumped for backfill reuse rather than trucked away.
The Tarrant Regional Water District, from its Cedar Creek office at 6613 Ashby Lane, Trinidad, TX 75163, (903) 432-2814. TRWD owns and operates the reservoir and issues Improvement Permits directly — no city or county sits in the shoreline permitting chain. Applications go through the District's online portal, and construction may not start until the application is approved. Submitting is not approval.
Maximum size is set by frontage on a sliding scale: 8 square feet of structure per linear foot of shoreline up to 150 feet, which caps at 1,200 square feet, then an additional 4 square feet per foot from 151 to 250 feet, 2 square feet per foot from 251 to 450, and 1 square foot per foot beyond 450. Nothing may come closer than 5 feet to a property line, and anything over 1,200 square feet must be 20 feet off. No structure may occupy more than a third of a channel width or come within 10 feet of the channel centerline.
Because of the flooding potential, TRWD purchased a flood easement covering the property between the 322.00 conservation or spillway elevation and the 325.00 hundred-year flood level. A permit is required for all construction, placement or operation of any structure or facility of any type, and for excavating or placing fill, at or below elevation 325.00 feet msl — including any addition or modification to an existing structure.
The application must carry both the owner's and the contractor's signatures, and the contractor must carry general liability of no less than $500,000 per occurrence naming TRWD as additional insured with a waiver of subrogation. The guidelines state there are no exceptions and a current certificate is required each time a permit is submitted. Lot corners at roadside and at elevation 325.00 must be clearly marked for the pre-permit inspection and stay marked throughout construction.
Enclosed structures are not allowed — solid sides are permitted only two feet down from the roofline. No living quarters below the spillway elevation, no toilets, no three-story sun decks. The deck must be at least 18 inches above elevation 322.00. Steel pilings must be at least 2-7/8 inches in diameter and wood pilings pressure treated and at least 6 inches, with no creosote. Anything extending more than 50 feet from shore needs a dusk-to-dawn white light, and since 2006 the owner's address must appear on a weather-resistant aluminum sign at least 1/16 inch thick with four-inch reflective letters, mechanically fastened and visible from the lakeside.
Building without a permit violates the District's General Ordinance and is a Class C misdemeanor carrying $10 to $1,000 per violation per day. Allow ten working days for processing. Permits run a minimum of 30 and a maximum of 90 days, and one extension may be granted for an additional fee.